May Schedule Changes

 


 

#22 N.W. Blvd.

 

Second Phase of Maple/Ash Project

 

Start: June 20, 2008
End: September, 2008

 

Route #22 N.W. Blvd. will be rerouted when the rebuilding of the Ash-Maple corridor moves from Ash to Maple. Outbound routing will be detoured while the inbound detour already in place will be changed from the current configuration.

 

Inbound, route #22 will resume regular routing by turning south from N.W. Blvd. on Ash to Boone but will detour by continuing south on Ash, left on Broadway, left on Walnut, right on Boone and continue on regular route.

 

Outbound, route #22 will detour by continuing north on Monroe, left on Montgomery, left on Walnut, right on N.W. Blvd. and resume regular route.

 

A temporary route, the 22/23 Fill Shuttle will serve the DSHS, the Native American Center and the West Central Community Center during the project. View details about the shuttle here.


 

#23 Maple/Ash

 

Route #23 Maple/Ash is currently undergoing two detours to accomodate two separate construction projects. To view a map that includes both detour routes click here.

 

Wall St. Paving Project

 

Start: July 9, 2008
End: July 30, 2008

 

Route #23 Maple/Ash will detour when Wall St. between Greta and Hawthorne will be closed for a repaving project.

 

Beginning Wednesday, July 9th, Route #23 Maple/Ash will use Country Homes Blvd from the Five Mile Park & Ride to Division until approximately July 23rd, when construction on Wall south of County Homes Blvd is expected to be complete.

 

On July 23rd, Route #23 Maple/Ash will use the original route from the Five Mile Park & Ride until it reaches Country Homes Blvd at Wall, where it will resume detour routing to Division until construction on Wall is complete.

 

Second Phase of Maple/Ash Project

 

Start: June 20, 2008
End: September, 2008

 

Route #23 Maple/Ash will change detour routing when the rebuilding of the Ash-Maple corridor moves from Ash to Maple. Maple from N. W. Blvd. to Broadway will be closed during this second phase. Inbound trips will resume regular routing on Ash at this time.

 

From downtown, route #23 will follow its regular route until the bus reaches Broadway, where it will detour by continuing north on Monroe, turn left on Montgomery, right on Walnut, left on Jackson, right on Maple and continue on regular route.

 

A temporary route, the 22/23 Fill Shuttle will serve the DSHS, the Native American Center and the West Central Community Center during the project. View details about the shuttle here.


 

#28 Nevada

 

Start: July 9, 2008
End: August, 2008

 

Wall St. Paving Project

 

Route #28 Nevada will detour when Wall St. between Greta and Hawthorne will be closed for a repaving project.

 

Beginning Wednesday, July 9th, 2008, Route #28 Nevada will not take the small loop from the Whitworth University Entrance Road that normally travels for a short distance on Wall Street. Coaches will layover at the stop on Hawthorne which is timepoint six, Whitworth College shelter, on the #28 Nevada schedule.

 


 

#33 Wellesley

 

Start: June 16, 2008
End: September, 2008

 

Route #33 Wellesley eastbound will detour as construction on a realignment of the Freya Way and Springfield intersections begins.

 

Traveling eastbound, route #33 will turn left from Freya Way at Trent, right on Fancher, right on Broadway, left on Havana and then resume the regular route.

 

Traveling westbound, route #33 will turn right from on Havana at Broadway, left on Fancher, left on Trent, right on Freya Way and then resume the regular route.

 


 

#90 Sprague

 

Route #90 Sprague will be rerouted starting on March 17, 2008, when construction will severely limit traffic on Appleway from Henry Rd. to Corbin. The detour will be in effect for the duration of the project.

 

From Barker at Alki, #90 Sprague will turn right on Alki, left on Corbin, right on Appleway/Sprague and resume regular route.

 

Temporary bus stops will be installed on Alki at Greenacres, on Alki at Long, on Corbin at Alki and on Corbin at Appleway/Sprague.

 


 

#94 East Fifth

 

Start: June 23, 2008
End: June 27, 2008

 

Route #94 East Fifth will detour as Park Rd. between Broadway and Sprague will be closed for construction. The detour is different for morning and afternoon routing because the affected portion of the route changes directions after noon.

 

A.M. Routing: Route #94 East Fifth outbound will detour by continuing east on Broadway at Park, right on Vista, right on Sprague, left on Park and resume regular route.

 

P.M. Routing: Route #94 East Fifth outbound will detour by turning right at Appleway, left on Vista, left on Broadway and resume regular route.


 

#124 North Express

 

Start: July 9, 2008
End: August, 2008

 

Wall St. Paving Project

 

#124 North Express will detour when Wall St. between Greta and Hawthorne will be closed for a repaving project.

 

Beginning Wednesday, July 9th, 2008:

 

Outbound Route #124 North Express will detour by turning right on Francis at Monroe, left on Division and left on Hastings to the entrance to the Hastings Park & Ride.

 

Inbound Route #124 North Express will detour from the Hastings Park & Ride entrance by turning right on Hastings, right on Division, right on Francis, left on Monroe and resume regular route.

 


 

May Schedule Changes

 

Check the routes and schedules page to see the changes that will take effect Sunday, May 18.